LSI Logic Corporation
Since it’s foundation in 1981, LSI LOGIC has been providing innovative
solutions to customers
worldwide. It’s product line ranges from standard ASSP semiconductors to highly
custom designed ASIC solutions. The company with annual revenues of $ 2.5
Billion is well known
as the foremost global supplier of custom, high-performance semiconductors.
Customers are
partnering with LSI LOGIC to take advantage of advanced products, technologies
and services the company is offering to provide a total solution. The
one-stop-shopping concept and the idea to put the whole system on a single chip
stands in sharp contrast with the strategy of many competitors.
LSI is operating its own high-volume fabrication facilities in California,
Colorado, Oregon and Japan, which sets them apart from its competition. LSI is
traded on the New York Stock Exchange operating (NYSE: LSI) and has its
headquarters in Milpitas CA, USA.
Business Environment
LSI LOGIC is manufacturing raw wafers and is internally selling
sorted and unsorted wafers to there outsourced assembly and test locations in
Asia. The wafers are produced in highly sophisticated wafer sites in California,
Oregon, Colorado and Japan. The subcontractors, who
are performing the assembly and test operations, are located in various
countries such as Korea, Malaysia, Taiwan and the Philippines. After the
finished components are fully tested and the chip put on the package, the
products are sold via an inter-company process to the LSI affiliates. From these
locations they get sold to the end customers in the US, Europe, Japan and HK
markets. Physically most of the products get directly drop-shipped from the
subcontractors to the end customer.
LSI LOGIC has made the strategic decision to use the SAP R/3 system
to build a highly flexible and integrated system environment to support the
ongoing changes in the marketplace. SAP was selected based on the rich
functionality, the full system integration, and the flexibility to further
absorb acquisitions and add-ons in e-commerce and new technology solutions. In
this sense the R/3 system with its new dimension products and e-commerce
solutions suits the company’s increasingly complex business processes and helps
to simplify the required system environment by reducing the number of systems
and interfaces without loosing the full systems integration to the core R/3
system.
SAP R/3 Implementation
Scope
Phase 1 (Worldwide
Financials) LSI LOGIC was implementing worldwide Finance (FI), Human
Resources (HR) and non-Inventory Purchasing (MM-PUR) in.
Phase 2 (Worldwide Sales)
included the add-on of finished goods inventory management
(MM), the worldwide selling of such products (SD), the project system (PS) for
tracking the extensive engineering efforts and the internal cost (CO) module. In
addition to this the inter-company sales of wafers between multiple sites was
also part of the project. The multi-site implementation included the following
SAP plants: Hong Kong (HK), Fremont, Gresham, Colorado Springs, Fort Collins
(US), Bracknell (GB), Tokyo, Tsukuba (JP), Kanata (Canada) and Kangnam-ku
(Korea). Based on the intensive usage of subcontractors for testing and
packaging, 15 subcontractor locations in 7 countries were also included in the
scope of phase two.
In addition, a customer
specific front-end module was developed which creates and changes the material
master in multiple sites and company codes, creates a sales quote and a project
record as required. All of these developments were created using the standard
SAP development tools, and are seamlessly integrated in the standard SAP system,
allowing LSI LOGIC to quickly launch an internal development project after
winning business with a prospect.
Phase 3 (Upgrade
4.0B to 4.6B) of the worldwide SAP R/3 installation covering financials, sales
of finished goods including project systems and own development. LSI LOGIC
decided to upgrade the SAP software to take full advantage of the Web enabled
functionality of release 4.6B. The company is following hereby a clear vision to
further rollout additional SAP functionality in the areas of planning,
production execution and costing. In addition E-Business functionality will be
expanded beyond sales order status checks for which release 4.6B will build the
base. The upgraded production system contained numerous user exists, and custom
development that had to be readjusted and tested where appropriate. Also new
functionality in the area of shipping on sales order schedule line level was
tested and will gradually implemented.
Support Teams
Phase2 Team Consulting Group, Inc. was introduced by
SAP America, Inc. to lead the TeamSAP consulting team. The consulting team
provided to LSI LOGIC included a group of 7-8 full time consultants from SAP
America, Catalyst Integration and TCG. The team was formed by 3 SD, 1
MM, 1 PS, 1 CO and 2 ABAP consulting resources. The two TCG consultants
were working full time at the client site for the time frame mentioned above.
They were responsible for the overall consulting team towards the customer LSI
and SAP America, the system design, interface and additional ABAP design,
configuration, integration and testing in the SD and the MM areas. This project
is used as a reference that also sizable SAP clients can implement the R/3
system timely, on budget and successfully with a limited number external
resources. Under the active guidance of TCG, we were able to build a solid SAP
R/3 infrastructure for the client.
The overall LSI core team consisted of approx. 25 resources.
All of these resources were fully assigned to the SAP project and were brought
to Milpitas for the full duration of the project. The in-house team was a mix
between LSI IS staff and end users from the US, Europe and Asia.
Phase 3 after going live with LSI with the worldwide sales and
distribution functionality in phase 2, LSI was counting on the small TCG
consulting team to help them for the upgrade project. One consultant was
full-time, the other one 2-3 days per week at the client site. TCG is proud that
the customer was able to do most of the upgrade work by using its own resources.
The TCG consultants spent most of their time, in solving issues, which were
assigned to them by the group lead in the MM/SD area. Therefore, their expertise
was used to solve difficult issues, which were essential for the LSI operation.
Duration
Phase 2 was implemented within a 16
months timeframe and went live in time on 02/07/2000. This date included the
printing of shipping papers in all the necessary subcontractors around the
world.
Phase 3 was implemented within at time frame
of 5 months. This time was used to adopt and retest all custom programming and
business processes. The 4.6B upgrade went live on 10/23/2000.
|